Studio
Whole-path compatibility

Don’t just ask if it fits.
Know what could stop it.

Check a washing machine from the building entrance to its final connections. Every conclusion shows the measurement, assumption or missing evidence behind it.

Complete routeEntrance, corridors, turns and final opening — in order.
Usable spaceProduct envelope plus the clearances installation needs.
Real connectionsPower, water and drain are part of compatibility.
What this public build is testing

Whether a transparent result — decisive constraint, facts, assumptions and next measurement — is more useful than a generic “it should fit.”

No simulated scanning or AI import. This build analyses only the measurements you enter. It does not inspect photos, links or rooms automatically.